Controlled Demolition

Controlled demolition of a redundant steel framed building on a live HWRC site in Staffordshire.

The demolition was carefully planned to commence mid-afternoon on a Friday and was completed in the early hours of Saturday morning when the site was closed for business.

Upon re-opening the site at 8.00am the building was completely demolished and all the debris was safely stored in skips in readiness for off – site disposal.

Pre-demolition works included :

• Structural surveys
• Service disconnections / isolations
• Establishment of a well defined exclusion zone
• Liaison with South Staffs Council
• Development of a Demolition Plan

The refurbishment works included :

• Concrete hardstandings
• Push wall panels
• Walkways and handrailings
• Drainage diversions
• Installation of soakaways

FCC Commented : “DXI did an exceptionally well planned job without a hitch and delivered on time to the highest quality, with a committed and dedicated team

  • CLIENT

    FCC Environment Limited

  • REFERENCE CONTACT

    Delvis Firth ; FCC Environment Ltd

  • CONTRACT VALUE

    £136K

  • CONTRACT DETAILS

    Controlled demolition of redundant steel framed and cladded building & associated refurbishment works within a “live” HWRC

  • SHARE

See how DXI can work for your project

Services

What Our Clients Say

Services
Contact

DXI Regeneration Limited.

Head Office
Landgate Business Centre,
Wigan Road,
Ashton in Makerfield,
Wigan,
WN4 0BX

+44 01942 720325

North Wales Office
St. Andrews Park,
Queens Lane,
Mold,
Flintshire,
CH7 1XB

+44 01352 706200

Website Terms & Conditions
Privacy Policy

© 2019 DXI Regeneration Limited.
Registered in England & Wales No 8718376.

Contact