Controlled Demolition

Controlled demolition of a redundant steel framed building on a live HWRC site in Staffordshire.

The demolition was carefully planned to commence mid-afternoon on a Friday and was completed in the early hours of Saturday morning when the site was closed for business.

Upon re-opening the site at 8.00am the building was completely demolished and all the debris was safely stored in skips in readiness for off – site disposal.

Pre-demolition works included :

• Structural surveys
• Service disconnections / isolations
• Establishment of a well defined exclusion zone
• Liaison with South Staffs Council
• Development of a Demolition Plan

The refurbishment works included :

• Concrete hardstandings
• Push wall panels
• Walkways and handrailings
• Drainage diversions
• Installation of soakaways

FCC Commented : “DXI did an exceptionally well planned job without a hitch and delivered on time to the highest quality, with a committed and dedicated team

  • CLIENT

    FCC Environment Limited

  • REFERENCE CONTACT

    Delvis Firth ; FCC Environment Ltd

  • CONTRACT VALUE

    £136K

  • CONTRACT DETAILS

    Controlled demolition of redundant steel framed and cladded building & associated refurbishment works within a “live” HWRC

  • SHARE

See how DXI can work for your project

Services

What Our Clients Say

Services
Contact

DXI Regeneration Limited

Head Office:
DXI Regeneration Ltd
Landgate Business Centre,
Wigan Road,
Ashton-in-Makerfield,
Wigan,
WN4 0BX

Tel: 01942 720325

North Wales Office:
DXI Regeneration Ltd
Trinity Square Business Centre,
3 Trinity Square,
Llandudno,
Conwy,
LL30 2PY

Website Terms & Conditions
Privacy Policy

© 2019 DXI Regeneration Limited.
Registered in England & Wales No 8718376.

Contact