Reinforced concrete slabs

Re-location of the existing compost pods to a temporary constructed HDPE lined composting pad.

Blasting of 22,000m3 of rock on three faces within a redundant quarry and processing (crushing & screening) into primary graded aggregates for incorporation into site batched structural concrete.

Trimming, including scarification of rock floor prior to regulating with fines material in preparation for sub-base formation.

Placement and compaction of a 200mm thick layer of Type 1 across the footprint of the proposed composting pad, prior to placement of a 200mm thick layer of site batched roller compacted concrete over 9480m2.

Construction of 210 lm of cast in-situ concrete lined channel, laid to falls and connected to a HDPE lined lagoon.

Stringent materials testing including flexural concrete beam tests were undertaken to satisfy the requirements the Environment Agency.

The lagoon was enclosed with a 2.4m high palisade fence.

All unsuitable material, including incompetent rock, soils from two fault lines and fines was spread and levelled within existing quarried areas.

  • CLIENT

    FCC Environment Ltd

  • REFERENCE CONTACT

    Mark Lancaster

  • CONTRACT VALUE

    £482K

  • CONTRACT DETAILS

    Construction of 9480m2 of roller compacted concrete composting slab

  • SHARE

See how DXI can work for your project

Services

What Our Clients Say

Services
Contact

DXI Regeneration Limited

Head Office:
DXI Regeneration Ltd
Landgate Business Centre,
Wigan Road,
Ashton-in-Makerfield,
Wigan,
WN4 0BX

Tel: 01942 720325

North Wales Office:
DXI Regeneration Ltd
Trinity Square Business Centre,
3 Trinity Square,
Llandudno,
Conwy,
LL30 2PY

Website Terms & Conditions
Privacy Policy

© 2019 DXI Regeneration Limited.
Registered in England & Wales No 8718376.

Contact